Electrification
of REE lamps (4)

Original page created on 29/09/2020.

Detachable lamps (continued)

Mounting of a validation circuit

I just received the connectors! They are really very small! In comparison, a DIL integrated circuit support looks like a monster!

The 1 mm pitch connectors

I quickly make a test circuit, by milling. It works well: the lamp easily plugs into the connector. For the desired brightness, a current of 0.6 mA is sufficient. The corresponding LED voltage drop is 1.72 V. An 18 kΩ resistor should be adequate for two lamps in series.

Front view of the test circuit

Click on the picture to zoom.

Rear view of test circuit

Click on the picture to zoom.

Preparation of the guinea pig coach

I chose a REE UIC B9c9x couchette coach for the first installation test. Its lighting strip is in place, and it has a location for the limiting resistor for the lamp LEDs.

To make ⌀ 0.4 holes at a distance of 1 mm on the ends of the coach, with good precision, we clearly need a template.

Making and using the drilling template

The template is designed to fit on the coach’s gangway, once the UIC bellows have been removed, which is very easy. It is made of 0.8 mm epoxy; 1.6 would have been better for guiding the drill. The notches visible on the top are the result of trial and error, they are unnecessary.

Drilling template and assembly guide

Installation of the template. I removed the lighting strip and the false ceiling to have a little more clearance.

Installation of the template on the coach

The holes in the end wall are made with a ⌀ 0.4 HSS drill bit (too much risk of breaking a carbide drill bit), freehand with a mini drill. But the flexibility of this drill bit means that two holes are not quite perpendicular. Catching up with squarer.

Drilling with the template

Result: the holes are very inconspicuous, aren’t they?

Resulting holes

Click the picture to zoom.

Assembly of the PCB

After several unsuccessful attempts, because it is very difficult to make the holes of the body and those of the circuit coincide, I make a guide: a ⌀ 0.4 nickel silver rod whose ends are chamfered, bent in a U 1 mm wide, soldered onto a piece of epoxy.

Assembly guide

The guide is positioned into the body holes. I manage to plug the circuit on it from behind. It will thus be perfectly aligned.

Installation of the assembly guide

After this first try, I modify the circuit: I remove the resistor and I solder two flexible wires. I put a double-sided adhesive. Once the circuit is plugged into the guide, the protective paper is removed from the adhesive, and the circuit is pressed against the wall. The guide is removed. The wires are soldered to the strip.

Test with a lamp

Everything is in place for the test. All that’s missing is the lamp.

Test with a lamp

Beginning of the lamp insertion. The contacts are not yet powered.

Test with a lamp

Insertion in progress: the lamp lights up.

Test with a lamp

End of insertion: the lantern is in place.

Test with a lamp

Click the picture to zoom.

Preparation of the final printed circuit

Among other things, these tests showed me that the planned circuit was too wide and got stuck on the outside.

I can therefore correct and validate the final circuit drawing, which I’ll have etched by a service provider. In fact, this circuit consists of two parts, right and left, which will be separated after assembly of the components.

Drawing of the final circuit

Note: the visible resistors are a priori useless, but they will allow a more general use of the circuit. I remind you that it can also be used for incorporated tail lights (see LEDs H3 and H4).

Continuation: recept and assembly of the final circuits on other coaches.